New Monks Farm Development

New Monks Farm Development

Feb 19, 2025 | Case study

Earthworks & Remediation

Large-scale earthworks were carried out to transform a former inert landfill into a mixed-use development, which included the following key works:

Excavation & Re-compaction: 210,000m³ of material was excavated and recompacted in preparation for the construction of 600 new homes and associated roads, ensuring the site met the required C.B.R standards.

Topsoil Stripping & Stockpiling: 96,000m³ of topsoil was stripped from the development area and stockpiled for future re-use.
Piling Mat Construction: 24,000m² of piling mat was constructed using concrete excavated from the site, which was then processed into 6F5 material by our in-house recycling division.
Relocation of Traveller’s Site: The existing Traveller’s site was relocated to facilitate the widening of the A27, which involved a cut and fill operation to create 18 new pitches.
Football Pitches: Brighton & Hove Albion FC expanded their training facility to accommodate the women’s team, for which we prepared the formation for the three pitches to be laid.

96,000m3 topsoil stripped & stockpiled

This case study showcases the complex earthworks and remediation project undertaken for the development of New Monks Farm on behalf of Adenstar Developments and their client Brighton & Hove Albion FC.

Recent News

Little Horsted Substation

Little Horsted Substation

Landfill Restoration

Landfill Restoration

New Monks Farm Development

New Monks Farm Development

St Mowden Park Copthorne

St Mowden Park Copthorne

Christmas Shutdown 2024

Christmas Shutdown 2024

Categories