Earthworks & Remediation
Large-scale earthworks were carried out to transform a former inert landfill into a mixed-use development, which included the following key works:
Excavation & Re-compaction: 210,000m³ of material was excavated and recompacted in preparation for the construction of 600 new homes and associated roads, ensuring the site met the required C.B.R standards.
Topsoil Stripping & Stockpiling: 96,000m³ of topsoil was stripped from the development area and stockpiled for future re-use.
Piling Mat Construction: 24,000m² of piling mat was constructed using concrete excavated from the site, which was then processed into 6F5 material by our in-house recycling division.
Relocation of Traveller’s Site: The existing Traveller’s site was relocated to facilitate the widening of the A27, which involved a cut and fill operation to create 18 new pitches.
Football Pitches: Brighton & Hove Albion FC expanded their training facility to accommodate the women’s team, for which we prepared the formation for the three pitches to be laid.
96,000m3 topsoil stripped & stockpiled
This case study showcases the complex earthworks and remediation project undertaken for the development of New Monks Farm on behalf of Adenstar Developments and their client Brighton & Hove Albion FC.